Wolfpack Projects Ltd
HomeServicesProjectsEquipmentContactSign in

Field services

Integrity work, clearing, grader crews, and site watch.

Integrity packages are built around the outage window. Pipeline clearing and logging, grader work, and 24-hour site security sit with that when the job needs them.

Wolfpack excavator and haul truck on site

Integrity services

01

Integrity services

Digs, repairs, replacements, testing, and close-out on gathering and transmission systems. Ask about the sequences we use when the outage window is tight.

Pipeline constructionIntegrity services

Scope

  • Anomaly digs and corrosion mitigation
  • Crossing replacements
  • Emergency repair service
  • In-line inspection support
  • Investigative digs and live-line excavations
  • Nitrogen purge, pipeline repair, and cut-out programs
  • Right-of-way reclamation
  • Pipeline abandonments
  • Pipeline class upgrades
  • Pipeline coating
  • Pipeline hydrostatic testing
  • Pipeline replacements with isolation and bypass
  • Pipeline reroutes
  • Valve replacements and upgrades
Civil construction

02

Civil construction

Site preparation and earthworks for energy, municipal, and industrial ground. The same crews that run pipeline packages can prepare pads, roads, and containment when the job needs it.

Civil construction

Scope

  • Erosion control and drainage infrastructure
  • Site preparation
  • Topsoil stripping, stockpiling, and export
  • Rough grading and import of fill
  • Graveling
  • Tank bases and containment
  • General contracting
  • Water and wastewater infrastructure
  • Pond, landfill, and lagoon development
  • Highway and road widening
  • Urban land development
  • Facility and industrial development
  • Reclamation
  • Railway construction
24-hour site security
24-hour site security

03

24-hour site security

Round-the-clock coverage for drilling rigs and remote locations, so the site stays watched while crews and operators work.

Site security
Grader services

04

Grader services

Grader work for access, yards, and community sites. The same crews that run field packages can grade when the ground needs it.

Pipeline clearing and logging

05

Pipeline clearing and logging

Right-of-way clearing and logging for pipeline corridors, including timber, brush, and access along the spread.

ROW clearing

Pipeline contractor · Fort St. John

Pipeline construction and integrity in the Peace Region.

Wolfpack Projects Ltd is an Indigenous-owned pipeline contractor based in Fort St. John. We bid pipeline construction, integrity digs, civil earthworks, right-of-way clearing, and 24-hour site security across the Montney, northeastern B.C., and northwestern Alberta.

Pipeline constructionIntegrity servicesCivil constructionROW clearingSite security

Peace Region

  • Fort St. John

  • Taylor

  • Dawson Creek

  • Chetwynd

  • Hudson's Hope

  • Tumbler Ridge

  • Grande Prairie


Fort St. John pipeline contractor

Construction, integrity, and Peace Region coverage.

Who is a pipeline contractor in Fort St. John?

Wolfpack Projects Ltd is an Indigenous-owned pipeline contractor based in Fort St. John. We run pipeline construction, integrity programs, civil earthworks, right-of-way clearing, and 24-hour site security across the Peace Region, the Montney, northeastern British Columbia, and Alberta.

Do you provide pipeline construction in the Peace Region?

Yes. Wolfpack is a Fort St. John pipeline construction contractor for gathering systems and mid-inch pipe from 2 inch to 30 inch. Crews mobilize to Dawson Creek, Taylor, Chetwynd, Hudson's Hope, Tumbler Ridge, Grande Prairie, and other Peace Region and Montney locations.

What pipeline integrity services do you offer in Fort St. John?

Integrity services include integrity digs, ILI support, anomaly repairs, coating, hydrostatic testing, sleeves and Clock Spring, live-line excavations, valve work, abandonments, and emergency repair. NACE Level 2 and Level 3 inspectors are on staff.

Do you run integrity digs and pipeline maintenance?

Yes. Integrity digs follow in-line inspection. We expose the line, repair or replace the section, restore coating, and reclaim the right-of-way. Maintenance and capital integrity programs can sit with construction on the same crew.

Is Wolfpack Projects Ltd Indigenous-owned?

Yes. Wolfpack is First Nations member-owned and operated, rooted in Blueberry River First Nations in Treaty 8 territory near Fort St. John.

On the land

Keeping our environment in mind

Wolfpack Projects Ltd

© 2026 Wolfpack Projects Ltd

Fort St. John, BC · Peace Region

778-256-7512wolfpackprojectsltd@gmail.com
HomeServicesProjectsEquipmentContact