Wolfpack Projects Ltd
HomeServicesProjectsEquipmentContactSign in

Fort St. John · Peace Region

Integrity services and integrity digs in Fort St. John.

Pipeline integrity is how Fort St. John operators keep lines in the ground. Wolfpack runs integrity programs, integrity digs, in-line inspection support, and emergency repair so maintenance work does not wait on a distant contractor.

Request a bidAll services
Pipeline integrity and repair work in northeastern British Columbia

Scope

What the package covers

Integrity digs follow ILI. We expose the line, confirm the anomaly, and repair or replace it: sleeves and Clock Spring installations from 2 inch to 30 inch, coating repair, cut-outs, nitrogen purge, and hydrostatic testing or retests from 2 inch to 48 inch. Live-line excavations and investigative digs sit on the same crew list.

Maintenance and capital integrity programs in northeastern B.C. also need valve work, stopples, abandonments, lowering, and crossing replacements. Wolfpack staffs that with NACE Level 2 and Level 3 inspectors and field personnel who already know Montney access, muskeg, and forested right-of-way.

If you are comparing Fort St. John integrity contractors, ask about outage windows, coating systems, and whether the same company can build the repair and restore the ROW. That is the package we bid.

Included work

  • Integrity digs and anomaly repairs
  • In-line inspection (ILI) support
  • Emergency pipeline repair
  • Coating repair and pipeline coating
  • Hydrostatic testing and retests
  • Sleeve and Clock Spring installations
  • Valve installations, replacements, and upgrades
  • Pipeline abandonments and lowering

Peace Region

Fort St. John · Taylor · Dawson Creek · Chetwynd · Hudson's Hope · Tumbler Ridge · Grande Prairie


More pipeline services

Related Fort St. John work

Pipeline construction equipment on a Fort St. John corridor

Pipeline construction in Fort St. John and the Peace Region.

Wolfpack Projects Ltd is a Fort St. John pipeline construction contractor. We build and install gathering systems and mid-inch pipe for energy companies working the Montney and Peace Region, with crews that also run integrity and civil packages on the same spread.

Pipeline construction
Civil construction and earthworks on a Peace Region energy site

Civil construction for pipeline and energy sites.

Pipeline spreads in Fort St. John still need ground work. Wolfpack runs civil construction and earthworks beside the pipe: site preparation, grading, access, and pads for energy, municipal, and industrial jobs.

Civil construction
Pipeline right-of-way clearing near Fort St. John

Pipeline clearing and right-of-way in Fort St. John.

Pipeline construction in forested northeastern B.C. starts with the right-of-way. Wolfpack clears timber, brush, and access for gathering lines and integrity programs based out of Fort St. John.

ROW clearing
Night site security on a Fort St. John oilfield location

24-hour site security for rigs and remote pads.

Pipeline and energy sites around Fort St. John need a watch when crews are off the clock. Wolfpack provides 24-hour site security and night security for rigs and remote locations.

Site security
Wolfpack Projects Ltd

© 2026 Wolfpack Projects Ltd

Fort St. John, BC · Peace Region

778-256-7512wolfpackprojectsltd@gmail.com
HomeServicesProjectsEquipmentContact