Wolfpack Projects Ltd
HomeServicesProjectsEquipmentContactSign in

Fort St. John · Peace Region

Pipeline construction in Fort St. John and the Peace Region.

Wolfpack Projects Ltd is a Fort St. John pipeline construction contractor. We build and install gathering systems and mid-inch pipe for energy companies working the Montney and Peace Region, with crews that also run integrity and civil packages on the same spread.

Request a bidAll services
Pipeline construction equipment on a Fort St. John corridor

Scope

What the package covers

Regional pipeline companies in Fort St. John compete on construction, integrity programs, and facility support. Wolfpack is built for the work those spreads actually need on the ground: pipe from 2 inch to 30 inch in YJ, insulated, and FBE coating, multi-line installation, reroutes, class upgrades, and replacements with isolation and bypass.

That is gathering and mid-inch pipeline construction from a Fort St. John base. The advantage is a local Indigenous-owned crew that can staff construction and integrity together, with NACE Level 2 and Level 3 inspectors on staff and a non-union workforce. Projects can run up to 300 km when the corridor calls for it.

We mobilize from Fort St. John across northeastern British Columbia and northwestern Alberta: Dawson Creek, Taylor, Chetwynd, Hudson's Hope, Tumbler Ridge, and Grande Prairie. If the package is a gathering line, a tie-in, a reroute, or a replacement during an outage window, start here.

Included work

  • Gathering and midstream pipeline construction
  • Mid-inch installation, 2 inch to 30 inch
  • Multi-line installation
  • Pipeline reroutes and class upgrades
  • Replacements with isolation and bypass
  • Block valve sites and crossings
  • Right-of-way construction support

Peace Region

Fort St. John · Taylor · Dawson Creek · Chetwynd · Hudson's Hope · Tumbler Ridge · Grande Prairie


More pipeline services

Related Fort St. John work

Pipeline integrity and repair work in northeastern British Columbia

Integrity services and integrity digs in Fort St. John.

Pipeline integrity is how Fort St. John operators keep lines in the ground. Wolfpack runs integrity programs, integrity digs, in-line inspection support, and emergency repair so maintenance work does not wait on a distant contractor.

Integrity services
Civil construction and earthworks on a Peace Region energy site

Civil construction for pipeline and energy sites.

Pipeline spreads in Fort St. John still need ground work. Wolfpack runs civil construction and earthworks beside the pipe: site preparation, grading, access, and pads for energy, municipal, and industrial jobs.

Civil construction
Pipeline right-of-way clearing near Fort St. John

Pipeline clearing and right-of-way in Fort St. John.

Pipeline construction in forested northeastern B.C. starts with the right-of-way. Wolfpack clears timber, brush, and access for gathering lines and integrity programs based out of Fort St. John.

ROW clearing
Night site security on a Fort St. John oilfield location

24-hour site security for rigs and remote pads.

Pipeline and energy sites around Fort St. John need a watch when crews are off the clock. Wolfpack provides 24-hour site security and night security for rigs and remote locations.

Site security
Wolfpack Projects Ltd

© 2026 Wolfpack Projects Ltd

Fort St. John, BC · Peace Region

778-256-7512wolfpackprojectsltd@gmail.com
HomeServicesProjectsEquipmentContact